Home
About Us
Directions
Church Calendar
What's New
Christian Studies
Music
Concert Series
Outreach
Who's Who
Youth
Membership Trends
Journey To Bethlehem
VBS 2007
Hoops-4-Hope
Weather Related
Lutheran Tidbits

What's New at All Shepherds

2007 New Driveway Entrance

In November 2007 a new driveway entrance was completed.

 

From the North Route 23:

Just past Lewis Center Road/Coal Bend is a deceleration lane onto Pionte Bluff (Right)

Turn left into All Shepherds parking lot entrance

From the South Route 23:

Turn left at Lewis Center Road/ Coal Bend

Turn left at Artesian Run

Turn left onto Pointe Bluff

Turn Right into All Shepherds parking lot entrance

2006 Building Addition

In June 2006 the building addition was completed. 

The Building Program Consisted Of:

  8-Classrooms added (total number = 12-classrooms)

  Classroom Furnishings

  Classroom Partitions

  Upgrade the kitchen (cabinets & additional electric outlets)

  Painted the barn to match the Church

  Fire lane to satisfy zoning restrictions

  Sealed and striped the parking lot

 

Building Design Team 

- Brad Halley, Chairman

2002 Worship Center

All Shepherds Lutheran Church began worshipping on January 25, 2002 at 6580 Columbus Pike - Lewis Center, Ohio.

The Worship Center Includes:

Sanctuary:

  210-Padded Chairs for Worshiper's

  40-Seats for Choir on Risers + Grand Piano

  Choir (Contemporary Music Team Instruments & Singers)

  Handbells & Chimes Tables & Instruments

  Audio/Visual Control Area

Classrooms:

  4-Classrooms

  Nursery

Offices Space:

  Pastor's Office

  Secretary's Office

  Work Area / Storage / Copier

  Office / Classroom

Music Program Rooms:

  Sacristy/Music Room

  Instrument Storage Room

Narthex/Fellowship Area

  Large Gathering Space

Parking

  Paved parking spaces for 120 vehicles 

 

 

All Shepherds Lutheran Church
6580 Columbus Pike
Lewis Center, OH  43035

Copyright 2002 © All Shepherds Lutheran Church